US-395 has a closure reported as of 2026-08-18T09:32Z, source: Caltrans; source freshness: healthy; coverage: full.

Fetch https://api-staging.mountainswitch.co/v1/routes/US-395/summary?jurisdiction=US-CA for structured route-summary detail.

## Coverage

This page shows full-road conditions reported by MountainSwitch's listed US-395 sources, including District 9 feed rows outside the modeled Mammoth Lakes, June Lake, Lee Vining, and Bridgeport approaches.

Those route-wide reports don't expand any destination verdict. Mammoth Lakes covers the reviewed US-395 approaches to the SR-203 junction before continuing on SR-203; June Lake covers the reviewed US-395 approaches to Lee Vining / Mono Basin and its separate SR-158 loop. Lee Vining's south path covers US-395 from June Lake Junction / S Jct. 158 to Lee Vining City Limits, and its north path covers Foot of Conway / 8 Mi. N of Lee Vining to the same terminal. Bridgeport's south path covers US-395 from the Conway Summit / Bridgeport side to North End of Bridgeport, and its north path covers Buckeye Road to the same terminal. US-395 outside each destination's modeled spans remains route-level only for that destination. US-395 north of Buckeye Road remains route-level only for Bridgeport.

MountainSwitch does not determine whether a route should be driven. Verify with Caltrans before traveling.